96 plot residential development, statutory approvals and Anglian Water SuDS adoption.
We were engaged to undertake the structural engineering for a purpose built three-storey building and equine rehabilitation centre.
As part of the interfacing of drilling rig (Ensco 122) with nodal gas platform (K14-FA-1) in the Dutch sector of the Southern North Sea, Pinnacle undertook significant works to re-route the main platform high pressure gas vent, as well as designing an interface for a 27m personnel gangway between…
That was the question posed by our client.
The answer: substitute helicopters for boat transfers
Pinnacle were appointed as structural engineering consultants to develop a safe and reliable boat landing in order to meet the demands of two gas platforms in the latter stages of their…
In July 2014, Shell/NAM commenced a well clean out and fracking project on the L02-FA-1 gas platform, located within the Dutch sector of the Southern North Sea (SNS). The plan was to carry out a process of Coiled Tubing (CT) clean out followed by a Perforating Run and then Fracking.
To execute…
High density development featuring a 35 storey tower on a constrained site with challenges that include easement corridors for Thames Water, DLR, Network Rail and the enhancement and naturalisation of the Ravensbourne River flowing through the site.