Brownfield Modifications

Owners and operators of offshore installations invest significant time and resource in order to safeguard the continued operation and production of existing assets. Pinnacle’s energy team have built a sound base of expertise and experience in dealing with the challenges of brownfield projects, in particular, the ageing assets within the Southern North Sea – many of which date back to the 1960’s and 70’s.

Ensuring the safety of personnel and environment

Safety of personnel and the environment are and will remain the over-riding highest priority. An integral part of achieving this is to maintain safe access across all offshore installations.
Combined with regular structural engineering reports Pinnacle provides an integral tool in enabling appropriate repairs and modifications to be undertaken in a planned process, thereby avoiding unplanned production holds and shut downs. Regular structural inspections also form a vital tool in managing safety of personnel, assets and the environment.

Engineering design work

At Pinnacle, we regularly carry out structural engineering design work such as:

  • New staircases
  • Deck replacement
  • Hand-railing
  • Walkways
  • Pipe line supports
  • Strengthening and replacement of structural members and;
  • Complete platform fabric maintenance campaigns

Along with structural engineering design, Pinnacle produce detailed general arrangements, as well as detailed fabrication drawings, specification and onshore and offshore inspection of structural strengthening, alteration and repair works.

Case Studies

Read More
As part of the interfacing of drilling rig (Ensco 122) with nodal gas platfor…
Read More
Read More
That was the question posed by our client. The answer: substitute helicopters…
Read More
Read More
In July 2014, Shell/NAM commenced a well clean out and fracking project on th…
Read More
Read More
In 2011 Shell / NAM commenced a campaign of well rejuvenation to gas wells wi…
Read More
Read More
As part of the interfacing of drilling rig (Ensco 122) with nodal gas platfor…
Read More
Read More
That was the question posed by our client. The answer: substitute helicopters…
Read More
Read More
In July 2014, Shell/NAM commenced a well clean out and fracking project on th…
Read More
Read More
In 2011 Shell / NAM commenced a campaign of well rejuvenation to gas wells wi…
Read More

Find out more

Please contact us