Mixed Use Development, Enfield

MIXED USE DEVELOPMENT, ENFIELD A 105,000 square foot mixed use development in London on a constrained site. This project is currently out to tender for a design and build contract. Pinnacle have been appointed to provide civil and structural engineering services and were given three weeks to develop RIBA Stages 3 and 4 and issue a tender pack....

Distribution Centre, Warrington

This client required the retro-fitment of a new base build shed approximately 350,000ft² to incorporate two 300,000ft² mezzanine floors and a new two-storey office building on the 42 acre site. The project was required incredibly urgently, so we devised a fast-track construction programme that employed resources and assets 24 hours per day to speed the...

Structural design of a distribution centre

This project called for the structural and civil design of a 350,000ft2 distribution warehouse, including a 80,000ft2 RSU for our client. In addition there was a requirement for associated ancillary buildings to be located within the 54 acre site. We undertook the structural and civil design for the 120m x 286m main warehouse, which was...

Stanion Logistics Park, Corby

This Logistics Park required over 2,500,000 ft² of warehousing and production areas together with associated HGV trailer spaces and staff parking areas, all on the 250 acre site. The site was previously in use as an open cast mine to a depth of some 16m before backfilling, which required a rolling cycle of soil surcharge...

Scroll to top